Number of Sites – 51
Quote
“Saving about $5K to $10K per month, considering the number of claims that are rejected now, because we are able to show pics that we did our job right, just the overall increase, the damages we are able to catch and show it to the production org, results in these savings. The number of claims paid has certainly reduced. THE APP PAYS FOR ITSELF 1000 TIMES OVER”. – Luke Gendreau – Warehouse General Manager
Synopsis from the Transcript
- Damages to the product when it arrived at the DC was too much.
- After LoadProof we are able to capture photos both Inbound & Outbound.
- Been using for more than a year.